| First fix | the pipes and cables run before walls and floors are closed up |
|---|
| Second fix | the fittings that go on after tiling: sanitaryware, taps, screens |
|---|
| Close-coupled | a toilet with the cistern sitting on the back of the pan |
|---|
| Back-to-wall | the pan sits on the floor against the wall with the cistern hidden in a unit |
|---|
| Wall-hung | the pan hangs off a frame in the wall with nothing touching the floor |
|---|
| WC frame | the steel frame in the wall that carries a wall-hung pan; around 1140mm standard, around 820mm for under a window |
|---|
| Rimless | a pan with no rim under the bowl edge, so there is nowhere for dirt to hide |
|---|
| Comfort height | a pan around 440 to 450mm to the seat, against 400mm standard |
|---|
| Document M | the accessible standard; 480mm to the seat with grab rails |
|---|
| Carronite | Carron's reinforced acrylic bath; a bonded layer under the shell so it does not flex and holds heat |
|---|
| P-shape and L-shape | shower baths that widen at the shower end, curved or square |
|---|
| Single and double-ended | taps at one end, or in the middle so both ends slope |
|---|
| Thermostatic | a shower valve that holds its temperature when water is drawn elsewhere |
|---|
| Concealed and exposed | a shower valve buried in the wall, or mounted on it |
|---|
| Riser kit | the rail a handset slides on; a rigid riser is the fixed pipe up to a drencher |
|---|
| Stone resin | a dense, heavy shower tray material that does not flex |
|---|
| Dual fuel | a towel rail on the central heating with an electric element for summer |
|---|
| BTU | the heat output of a radiator; we size it from the room |
|---|
| IP44 | the splash-proof rating a mirror or light needs in a bathroom zone |
|---|
| Part P | the building regulation covering bathroom electrics in England and Wales; registered electrician only |
|---|
| PVC-core | a vanity unit carcass that is waterproof all the way through, not just on the face |
|---|